Moses Engineering was hired by the University of Florida to produce a report that prioritized and estimated the construction cost for the replacement of all of the remaining oil filled medium voltage switches on campus. Many of these switches were aging, leaking, and/or had no available replacement parts. The report grouped the switches by priority such that each group of switches would become a UF Physical Plant Division Minor Project (<$1,000,000). Moses Engineering was subsequently selected for the design and construction administration of the first four projects (RP #1, #2, #3 & #4).

Moses Engineering design phase services included field verification of existing conditions including manhole dimensions, cable sizes, cable types, cable racking condition. Also included was the location of existing underground utilities to minimize changes during construction. The oil-filled switches were replaced with new SF6 filled switches with electronically controlled vacuum fault interrupters. While some new switches are located above ground, most are located in custom designed traffic-rated vaults to maintain a “clean” exterior aesthetic to the campus.

OwnerUniversity of Florida

Construction Cost$2.8 Million

ServicesDesign





If You Need A Solution ... We Are Available For You

Contact Us